2018-19 Winter Maintenance

The work for 2018-2019 looked quite simple:

  • Remove the copper hatch edging and slides, clean, lacquer and re-fit
  • Investigate and address the brown stained water that appears to be entering cuddy through the deck.
    • Remove the deck cleats, seal holes through deck and re-fit.
    • Remove the internal cuddy wooden slats / trim.
      • Number / label as appropriate – to aid refitting
      • Clean behind them to remove stain marks and other dirt/dust
      • Sand the slats then oil them
      • Refit the slats
  • Create and attach engine panel protector: two vertical wooden rails with a horizontal perspex shield
  • Remove, clean, lubricate and replace engine cover latches.
  • Polish the topsides / hull – as in previous years
  • Anti-foul the hull – as in previous years

As always, reality has overtaken us… photos and details to follow

I should add that Simon’s 2018 repairs to Serina’s mast and tiller have been a great success, so there isn’t any need to do anything on them this winter.

 

Remove the copper hatch edging and slides, clean, lacquer and re-fitimg_8066

 

Investigate and address the brown stained water that appears to be entering cuddy through the deck